Kings College Hospital
This is a new build project but built around an existing Theatre Block within the hospital. Access to each elevation is separate, via the crane including for all plant and materials. Apart from pile caps we had to remove a solid concrete tunnel (500mm thick walls and 700mm slab) in sections in order to release the ground for the new foundations Builders work also included for the new Helipad built on the roof of the existing 12 storey structure;
- Composite floors (decking/ concrete)
- Blockwork enclosures
- Pad Stones